The damage must be recorded for bridge steel frame that will greatly determine the method of reinforcement is :
Damage of Concrete- Concrete chipped
- Formed beehive
- Corrosion of steel reinforcement
- Dirty, mossy, aging or weathering of concrete
- Rupture or loss of material
- Deflection
- Deterioration of paint and galvanized
- Rust
- Changes on component form
- Crack
- Rupture or loss of material
- Elements that are not true
- Cable bridge wear
- Loose connection
- Insufficient space to move
- Position grounding is not perfect
- Mortar base crack or fall out
- Displacement or excessive deformation
- Foundation disabilities (broken, torn or cracked)
- Loose parts
- Lack of lubrication on the base metal
- Damage to the floor connections were not as high
- Damage caused by charged connection
- Loose parts
- The missing part
- Cracks on asphalt due to movement on the connection
Damage of Drainage Pipe
- Stream and drainage pipes clogged floor
- Element is missing or does not exist
- Damage of Surface Coating
- Slippery surfaces
- Rough surfaces / potholes and cracks on surface coatings
- Corrugated surface Coating
- Surface coatings of excess
- Surfaces slippery sidewalks
- Holes / cracks / rough on pavement
- The missing part
- Utility malfunction